Home Real estate Sale of land in Nhon Duc project

Sale of land in Nhon Duc project

Sale of land in Nhon Duc project

Sale of land in Nhon Duc project

General introduction
The 28,751ha residential area is located at Hamlet 2 – Nhon Duc Commune – Nha Be District, this is a prime location in the South of Saigon. Being located right next to the GS Metrocity project of Korea’s GS Group of 340 hectares, with the surrounding large and small projects surrounding it, creating a potential regional link, among These are the three major urban areas of international stature: Phu My Hung Urban Area, GS Metrocity Urban Area and Hiep Phuoc Port Urban Area.
Project location
Housing project of 28,751ha is located in Hamlet 2 – Nhon Duc Commune – Nha Be District
The Housing project is 28,751ha away from Phu My Hung Urban Area – an urban project which is considered as the first model of Vietnam – only 8.5km. The success of Phu My Hung in Saigon South has contributed significantly to promoting the overall development of the region, bringing a large number of residents and offices of many multinational companies and international corporations to Nam Sai. Gòn. Therefore, the 28,751ha residential area project will inherit traffic benefits, a series of world-class service, entertainment and entertainment systems such as Crescent Mall, yard cluster. Saigon South Golf, Phap Viet Hospital, Tam Duc Heart Hospital.
Legal project
The project was decided by the People’s Committee of Ho Chi Minh City to temporarily allocate land to implement compensation for site clearance and preparation for investment in construction of residential areas under Decision No. 3236 / QD-UBND of June 30, 2004.
– The People’s Committee of Nha Be district decided to approve the detailed construction plan of 1/500 according to Decision No. 1413/QD-UBND dated December 29, 2008.
– The project’s technical infrastructure system was approved by the Ho Chi Minh City Department of Construction in accordance with Decision No. 157/QD-SXD-PTN dated September 14, 2009.
– The People’s Committee of Ho Chi Minh City decided to allocate land to invest in the project technical infrastructure system according to Decision No. 5976/QD-UBND dated December 31, 2009.
Detailed planning
The project is planned into the following functional areas:
– Housing area includes terraced houses of gardens, villas, and apartments, accounting for 53.3%
– The area of ​​public works including kindergartens and department stores accounts for 2.4%
– Land for green parks, sports clubs, accounting for 10.1% of the land area
– Land for traffic and sidewalks occupy 34.2% of the total area
– Apartment housing type: 435 units
– Commercial townhouses: 210 units
– Garden villas: 245 units
– Townhouses: 230 units
Utilities around
The project is in contact with 3 sides of Long Kieng river with river landscape, fresh and quiet living environment, it will definitely be an ideal resting place for customers after a hard working day.
In addition, there is an education system for children such as primary and secondary schools, kindergartens, health stations, bus routes, which will be very convenient to care for and educate children. .
Progress
The project has completed the construction of technical infrastructure systems: roads, electricity, water supply and drainage, waste water treatment, parks, lakes, landscapes, trees …
Detail
The investor of the project is an investor with a healthy finance, derived from a reasonable business strategy, with high responsibility to customers. Although the real estate market situation is still difficult, the investor still carries out the investment in technical infrastructure of the completed project. Please refer to the actual image of the project at Website: bactrungnam.com.vn
Sale price and payment
Contact: Planning – Sales Department
Phone (028) 62.943.301, Mobile: 0909.44.18.38 (Mis. Hoa)
Address: 1st Floor, Block A, An Khang Building, No. 30, Street 19, An Phú Ward, District 02, TP. Ho Chi Minh
Fax: 028 62.943.303
Email bactrungnam@bactrungnam.com.vn